Cement Mill Using In Oilfield Indonesia

One operator faced top-up cement in the annulus between the 9 58- and 13 38-inasing strings in an offshore gas well and could not cut and pull casing as plannedeatherford deployed the endura dual-string section mill and safely exposed a 98-ft section of formation.

Latest News